Timing is Everything

General Usage Instructions

In order to connect, you must first setup your account by following the instructions here. or BIM 360 Admins can find the Raken BIM 360 Integration in Account Administration under the “Apps” tab. Select to add to your BIM 360 Account. Your Grit Virtual, Inc. BIM 360 Integration is now active in BIM 360.

Navigate to the account you wish to connect.

Click on "Integrations"

Ensure you follow the steps in the link provided in the Autodesk® BIM360® tile.

Under BIM360, click "Connect".

Enter your credentials.

If all worked, the BIM360 tile will show "Connected"

Navigate to a project.

Click on settings -> models.

You will see an "Import from BIM360" button.

Find the model and version in the tree.

Click upload.

Commands

Installation/Uninstallation

Additional Information

MASTER SCHEDULE

T-MINUS 6 WEEKS – 2 YEARS

The master scheduler or project manager will create or import a Gantt style CPM schedule. The activities of the schedule are then attached to the representative model elements as well as assigned to the subcontractor responsible.

 

LAST PLANNER™

T-MINUS: 3 – 6 WEEKS

As an activity comes into the 6-week window, it is time to introduce the Last Planner, the foreman subject matter expert to break the activities into tasks. This is done by either selecting a subset of objects, creating multiple steps to the procedure, or both. These tasks should represent work packages that are completed without interruption and share the same Tools, Information, Materials, Manpower and Equipment (TIME).

 

SCENARIOS

T-MINUS: 3 – 6 WEEKS

As the master schedule is broken down by Last Planners, one activity could now be represented by 20 tasks. Grit combines CPM principles with early-age artificial intelligence to re-constrain the schedule by restricting crew supply and simulating alternative work areas to deliver the optimal construction sequence.

 

LOOKAHEADS (1, 3, 6-WEEK)

T-MINUS: 1 WEEK – 6 WEEKS

After a project team determines a construction sequence to move forward with, tasks/activities are represented again on a bar chart. Different from Gantt, the rows now represent individual trades rather than individual activities. 4D playback is available on this page.

 

SPRINTS (WEEKLY WORK PLAN)

T-MINUS: 1 DAY – 1 WEEK

Grit will create a backlog of work using the same sequence as the lookaheads. The project team will verify the sequence by committing to tasks or not. Moving tasks to in progress and completed calculate KPIs as well as initiate A.I.-based contingency simulations.

Known Issues

Contact

Company Name: Grit Virtual, Inc.
Support Contact: ccallen@gritvirtual.com

Author/Company Information

Grit Virtual, Inc.

Support Information

When assistance is needed, click User Guide or Request Help under the Help menu in the bottom of the left menu.